manual turret bench top milling machine manufacturer https://www.talentcnc.com/Turret-milling-machine

manual turret bench top milling machine The manufacturer of the manual turret bench top milling machine should use anchor screws to fix the machine on the foundation. The anchor screws provided by us should be placed according to the corresponding positions during installation, and the lifted machine tools should be slowly lowered. Each horizontal adjustment bolt on the machine tool is inserted into the anchor screw.

Since the horizontal adjustment bolt cannot be used at this time, please adjust the horizontal thickness of the machine tool first with the wedge pad iron, and then fix the anchor screw with cement. After the machine tool is installed, the following requirements are met:

a) The distance between the table plane and the ground plane is 800mm.

After the cement is set, the wedge pad iron is removed, and the horizontal adjustment bolt is used to fine-adjust the machine level.

A 0.02/1000mm level should be used

Since the mud hole will sink slightly before solidification, the machine tool level should be rechecked and adjusted as necessary after 6 months of machine installation, and then it should be rechecked and adjusted once a year.